SUNSET BEACH

BUYING A LOT

Last updated October 2026

THE SHORT ANSWER

Before you buy a vacant lot in Sunset Beach, find out what the town will let you build, how the lot will handle wastewater, and what flood and coastal rules apply. A low price on land means little if the lot cannot get a septic permit or needs costly work to meet flood rules. Check these items during your due diligence period, not after closing.

I have worked in real estate since 1995, and I am licensed in both Carolinas. Land is where buyers get surprised the most, because the problems are often in paperwork you cannot see from the road. My job is to help you ask the right offices the right questions while you can still walk away.

01

What permits do I need to build on a lot in Sunset Beach?

You will need a building permit from the Town of Sunset Beach, and you may need other permits too. The town’s Building Inspections FAQ says much of the town sits in a floodplain and in a high wind zone. It asks owners to contact the department before starting work.

A few points from the town’s FAQ that matter for new construction:

  • Projects over $40,000 need a licensed North Carolina general contractor.
  • A permit expires if work does not start within six months of issue.
  • If work stops for twelve months, the permit expires.
  • Removing trees needs a Fill and Grade permit. The town says there is no charge, and an inspector looks at the trees before cutting.
  • Residential setbacks are in the town’s Code of Ordinances.

The town’s Planning and Zoning staff handle questions about zoning, setbacks, subdivision rules and stormwater. The office is open 8:00 am to 5:00 pm, Monday through Friday, and the town recommends making an appointment.

02

Is there public sewer, or will I need a septic system?

It depends on the lot, so get the answer in writing before you buy. The town’s 2010 CAMA Land Use Plan reported that, as of 2007, wastewater in town was handled mostly by private septic systems and package treatment plants, with limited county sewer in some areas. The same plan said the town and Brunswick County were planning a sewer system for the parts of town that were not yet served. It also noted that Brunswick County took over the town’s water system in July 2007.

That plan is more than a decade old, so do not rely on it for a single lot. Ask these questions:

  • Is there a sewer tap at the property line? Call Brunswick County Public Utilities with the address or parcel number.
  • What fees are due to connect, and has any of it already been paid?
  • If the lot is in a private development, who owns the sewer lines and who bills for service?

If there is no sewer, you will need a septic permit from Brunswick County Environmental Health Services. A Registered Environmental Health Specialist does a site evaluation to see if a system can be permitted. The county also lists other paths that use a licensed soil scientist, an engineer, or an Authorized On-site Wastewater Evaluator. Make your offer depend on a passing result.

TAKE THE NEXT STEP

Watching land and homes in Sunset Beach?

See the latest local numbers before you make an offer on a lot.

View the Sunset Beach Market Report

03

How does the flood zone affect what I can build?

The flood zone sets how high the home must sit and can shape the foundation, the design and the insurance cost. Two lots on the same street can be in different zones.

  • Look up the address with the state’s free tool at flood.nc.gov. It shows flood hazard and potential insurance rates for a specific address.
  • Ask the town’s Building Inspections office what elevation the lowest floor must meet on that lot.
  • Ask a surveyor about the lot’s ground elevation, since that affects how much the home must be raised.

Get a builder’s rough cost for meeting those rules before you settle on a price for the land.

04

When do I need a CAMA permit in Sunset Beach?

You may need a CAMA permit if the lot is in or affects an Area of Environmental Concern, such as land near the ocean, marsh or coastal waters. CAMA is the state’s Coastal Area Management Act, run by the NC Division of Coastal Management.

  • The state’s guide says a CAMA minor permit covers smaller projects, such as a new house, that do not need a larger state or federal permit.
  • Minor permits are issued by a local permit officer. These are often local building inspectors, zoning staff or planners. If a town has none, you contact the Division of Coastal Management district office.
  • The Town of Sunset Beach says a CAMA permit does not replace a town building permit. You submit a copy of your CAMA permit with two sets of plans.

Learn more on the NC Division of Coastal Management website.

05

Will an HOA need to approve my house plans?

If the lot is in a community with an HOA, you will likely need its approval before you build. Many communities have an architectural review board with rules on size, style, colors, fences and landscaping.

  • Get the covenants, bylaws and design guidelines before your due diligence ends.
  • Ask whether there is a deadline to start or finish building.
  • Ask about review fees, deposits and dues on vacant lots.

HOA approval does not replace town permits. You need both.

QUESTIONS PEOPLE ASK

Frequently Asked Questions

Does every lot in Sunset Beach have public sewer?

Do not assume it does. Call Brunswick County Public Utilities with the address or parcel number to ask whether a sewer tap is at the property line and what connection fees apply.

Who issues septic permits in Sunset Beach?

Brunswick County Environmental Health Services. A Registered Environmental Health Specialist evaluates the site to see if a septic system can be permitted.

Does a CAMA permit replace a Sunset Beach building permit?

No. The town says you still need a town building permit. Submit a copy of your CAMA permit with two sets of plans.

Do I need a permit to clear trees on my lot?

Yes. The town requires a Fill and Grade permit, which it says has no charge. An inspector looks at the trees before they are cut.

LET'S TALK

Looking at a lot in Sunset Beach?

I will help you line up the sewer, septic, flood and permit questions before your due diligence period ends.

Search Sunset Beach HomesBook a CallCall 843-203-9962 Call 910-981-1311Email Danielle

KEEP READING

Related Reading

Sunset Beach NC Real Estate: Buying, Selling and Relocating Guide
Live Sunset Beach NC Market Report
New Construction Homes in Brunswick County, NC
Moving to Brunswick County, NC: Your New Resident Checklist

This post is general information, not legal, engineering or permitting advice. Rules change. Confirm requirements for your specific lot with the Town of Sunset Beach, Brunswick County and the NC Division of Coastal Management.

Danielle King, REALTOR, Realty ONE Group Dockside

DANIELLE KING, REALTOR®

Results that MOVE you

843-203-9962 | 910-981-1311  ·  DANIELLE@YOURKEYTOREALTY.COM
YOURKEYTOREALTY.COM  ·  LICENSED IN NC & SC

REALTY ONE GROUP DOCKSIDE

 About the Author 
Danielle King, REALTOR with Realty ONE Group Dockside, licensed in NC and SC

Danielle King, REALTOR®

Licensed in NC (#363826) and SC (#145618) | Realty ONE Group Dockside

Danielle helps sellers, buyers and investors in Brunswick County NC, Tabor City NC and Horry County SC. Her real estate roots go back to 1995. She writes about the local market here on her blog.

Read My Story Book a Call